The EVO3 on site Bonneville

This morning August 7, conclusive tests have been conducted on the site of Bonneville during the bitumen flow.

To optimize this action, and more performance in achieving the latter, the communication system VOKKERO® EVO3 has allowed us to optimally link the truck driver and the foreman.

Vokkero équipe le chantier de Bonneville

Share this article:

Other related articles

  • The CSJC trusts VOGO to boost athletic performance in Corsica

    The Centre for Sport and Youth of Corsica (CSJC), a member of the Grand INSEP network, has chosen VOGO to equip its facilities with an innovative video solution dedicated to performance analysis and sports training. A technical and human challenge successfully met by the VOGO teams The CSJC wanted to acquire a shared and flexible…

    The CSJC trusts VOGO to boost athletic performance in Corsica